OWNER | MAIN CONTRACTOR / CONSULTANT | PROJECT TITLE | COMMENCEMENT / COMPLETION DATE | VALUE (RM) |
Pengurusan Aset Air Berhad | HLA Associates Sdn Bhd | Cadangan Membina Loji Rawatan Air Buluh Kasap, Johor. Pakej 2 – Cadangan Membina, Menyiap Dan Mentauliah Rumah Pam, Tangki Menara Berkapasiti 2.5 Juta Liter, Tangki Sedutan Berkapasiti 6.0 Juta Liter Di Kg.Alai Dan Paip Air Terawat Serta Kerja-Kerja Berkaitan | 02/04/2018 – 01/10/2019 EOT NO. 4 – 09/12/2020 CPC 09/12/2020 |
13,599,000.00 |
Johor Corporation | Muda Consult Sdn Bhd | Cadangan Melaksanakan Dan Menyiapkan Kerja Tanah, Jalan Dan Perparitan Untuk Pembangunan ‘Muar Timber Industrial Park’ Di Atas Lot Asal (PTD 13399, PTD 13400 Dan PTD 8531) Mukim Jalan Bakri, Muar, Johor Darul Takzim | 22/02/2018 – 27/02/2020 EOT NO. 2 – 30/11/2020 CPC 30/11/2020 |
132,075,471.70 |
IJM Construction Sdn Bhd | Sepakat Setia Perunding Sdn Bhd | Proposed Mixed Development on Lot PT 33011 – PT 33018, PT 33029 – PT 33039 at Mukim Tanjung Dua Belas, Daerah Kuala Lngat, Selangor Darul Ehsan. Package 9c : Construction and Completion of 14.0 ML Ground Reservoir and Other Associated Works (BR/MIW/RS02) | 11/07/2016 – 10/07/2017 EOT NO. 4 28/09/2018 CPC 24/05/2019 |
8,207,000.00 |
Pengurusan Aset Air Berhad | O&L Jurutera Perunding | Cadangan Pembinaan Kolam Baru Lendu Berkapasiti 22.73 Juta Liter dan Kolam Air Baru High Level Berkapasiti 4.546 Juta Liter di Mukim Alor Gajah,Melaka | 02/01/2015 – 02/07/2016 CPC 14/07/2017 CMGD 14/10/2019 | 25,990,000.00 |
Unit Perancang Ekonomi Negeri Selangor | Taliworks Construction Sdn Bhd | Sub-Contract No.3A – Collect , Excavate, Handle,Lay, Fix,Join,Test,Flush and Commision MSCL Treated Water Gravity Main From Ch 0.0 to Approximately Ch 3,223.0 And All Associated Works (Package A). | 01/09/2014 – 30/04/2015 CPC 09/03/2017 | 2,579,027.49 |
Johor Land Berhad | Johor Land Consultant | Construction of 49 units of Terrace Houses type Achillea at Neighbourhood 15, Bandar Dato’ Onn, Johor Bahru, Johor (Contract No. 6) (JLB/T/8/14) | 02/06/2014 – 22/02/2016 CPC 07/02/2017 CMGD 15/01/2020 |
9,000,000.00 |
Johor Land Berhad | Johor Land Consultant | Construction of 57 units of Terrace Houses type Arnica at Neighbourhood 15, Bandar Dato’ Onn, Johor Bahru, Johor (Contract No. 5) (JLB/T/7/14) | 02/06/2014 – 18/03/2016 CPC 19/04/2017 |
10,400,000.00 |
Scientex Quatari Sdn Bhd | Total QS Services | Proposed Construction and Completion of Structural Works For 1.5MGD Elevated Reservoir On Lot 812, Mukim Senai, Daerah Kulaijaya, Johor For M/S Sientex Quatari Sdn Bhd | 01/11/2014 – 31/03/2016 CPC 23/04/2017 CMGD 22/04/2018 |
3,980,000.00 |
Johor Iskandar Malaysia | SJIC Bina Sdn Bhd | The Proposed Design and Build of Service Bridge For Sewer Main and Relocation of The Existing Sewer Main Bridge 7A at The Coastal Highway, Iskandar Malaysia | 16/04/2014-05/08/2014 CPC 13/04/2014 CMGD 13/08/2015 |
1,614,640.00 |
Jabatan Pengairan Dan Saliran Negeri Selangoir | Jabatan Pengairan Dan Saliran Negeri Selangoir | Kerja-kerja Menaiktaraf Sistem Saliran Bagi Mengatasi Masalah Banjir Kilat di Pelabuhan Klang, Daerah Klang, Selangor Darul Ehsan Fasa 1 (Pakej 1). | 24/06/2013 – 23/06/2015 CPC 30/06/2018 CMGD 30/06/2019 | 14,473,506.50 |
Perbadanan Kemajuan Negeri Selangor | Perbadanan Kemajuan Negeri Selangor | Kerja-kerja Tanah, Linear Park dan Kolam Tadahan Serta Infrastruktur yang berkaitan di Seksyen 8 dan sebahagian Seksyen 3, Kota Puteri, Mukim Rawang, Daerah Gombak, Selangor Darul Ehsan. | 16/04/2013 – 26/03/2015 CPC 02/04/2017 CMGD 30/11/2018 |
22,475,863.54 |
Johor Land Berhad | Johor Land Berhad | Construction of 4 Block of 5 Storey Low Cost Flats at Taman Seroja (Phase 1), Johor Bahru, Johor (JLB/T/9/12) | 31/03/2013-31/12/2014 CPC 31/12/2014 CMGD 12/09/2017 |
12,500,000.00 |
Johor Land Berhad | Johor Land Consultant | Construction of 10 units of shopoffices at Taman Seroja Johor Bahru, Johor (JLB/T/11/13) | 23/09/2013 – 22/0820/14 CPC 20/07/2015 CMGD 05/05/2018 |
3,011,000.00 |
Pengurusan Aset Air Berhad (Johor) | Sepakat Setia Perunding (Sdn) Bhd | Proposed Sludge Treatment Works For Yong Peng 2&3 Water Treatment Plant & Distribution Improvement Works In Johor Pakage 5 : Distribution Improvement From Pengkalan Bukit A Reservior To Kg. Mesjid (project 4) And Supply Improvement System At Bakri, Muar (Project 5) | 22/04/2013 – 11/09/2014 CPC 11/09/2014 CMGD 08/11/2016 |
16,590,000.00 |
Jabatan Perkhidmatan Pembentungan | Perwira Al-Shura Consulting Engineers Sdn Bhd | Kerja-kerja rasionalisasi 17 buah loji rawatan kumbahan di kawasan Setapak, Keramat dan Wangsa Melawati, Kuala Lumpur. Pakej Zon B1, B2 dan B4 | 10/01/2012 – 15/04/2017 CPC 15/12/2017 CMGD 23/08/2019 |
36,373,378.80 |
Kementerian Tenaga,Teknologi Hijau Dan Air (KeTTHA) | Uniti Consultant Sdn Bhd | Cadangan Pembinaan Paip Pembentungan Tambahan Dan Rasionalisasi Loji Rawatan Kumbahan Di Kawasan Tadahan Lobak 2, Seremban ,Negeri Sembilan | 22/05/12-10/05/15 CPC 10/05/2015 | 17,911,560.70 |
Johorland Berhad | Johorland Berhad | Construction of 154 Unit Low Cost Terrance House At Taman Bukit Tiram (Phase 2), Johor Bahru, Johor (Tender No: JLB/T/2/11) | 22/07/11 – 21/07/12 CPC 21/12/2012 | 8,989,000.00 |
Jabatan Pengairan Dan Saliran Malaysia | Jabatan Pengairan Dan Saliran Malaysia | Rancangan Tebatan Banjir Bandar Pekan, Pahang Darul Makmur – Kerja-Kerja Pembinaan Ban Barat, Ban Selatan, Parit Utama, Struktur Kawalan Sg Mat Dulang Dan Kerja-Kerja Berkaitan (Kontrak No : JPS/IP/PB/5/2011) | 22/03/11 – 21/09/12 CPC 26/11/2012 | 26,554,189.00 |
Ranhill Engineers And Constructors Sdn. Bhd. | Ranhill Engineers And Constructors Sdn. Bhd. | Design, Construction, Supply, Delivery, Installation, Integration, Testing And Comissioning Of The Programme Of Works. – Sub-Contract No: C1482/9001 (SAJH/KP/T/42/2008) – Sub-Contract Works For Construction Of New 405ml Sedenak Balacing Reservior And Falling Mains, Johor Bahru. | 01/01/10 – 28/02/11 | 13,692,730.00 |
Pembinaan Sahabatjaya Sdn Bhd | Aramijaya Sdn Bhd | Membina LebuhRaya Persisir Pantai Johor Bahru Ke Nusajaya (Section 2 : CH 2400 To CH 9500). -Relocation Of SAJ Services At Section | 25/08/09 – 24/12/09 | 2,722,183.00 |
Ranhill Engineers And Constructors Sdn Bhd | Ranhill Engineers And Constructors Sdn Bhd | Proposed Pipe Rehabilitation Works Year 2008 For Kluang District Sub. Con. C1500/9001 – 300mm ND M.S Steel Pipeline At CKL1:300mm ND M.S Pipeline At Sen See, Spg Renggam. CKL2:300mm ND M.S Pipeline At Jalan Kota Tinggi. CKL3:150mm ND UPVC Pipeline At Jalan Besar Kluang | 15/09/08 – 14/04/09 | 2,318,037.00 |
Jabatan Bekalan Air Kedah | Taliworks Corp. Bhd | Projek Bekalan Air Padang Terap Pakej 1, 2 & 3 Secara Reka Dan Bina Sub-Contract No. 24 : Construction And Completion Of 1.5ML Suction Tank, Booster Pumping Station And TNB Sub-Station, 5.0ML Service Reservior And Ancillary Works At Bukit Kayu Hitam | 08/01/08 – 14/10/08 | 1,753,103.02 |
Ranhill Engineers And Constructors Sdn Bhd | Ranhill Engineers And Constructors Sdn Bhd | Design, Construction, Supply, Delivery, Installation, Integration, Testing And Comissioning Of The Programme Of Work Improvement Of Water Supply System In Yong Peng, Batu Pahat – Sub – Contract Works Construction Of 202ML Elevated Reservior And Ancillary works – (C1401/9011) | 01/04/08 – 14/10/08 | 3,080,000.00 |
Ranhill Engineers And Constructors Sdn Bhd | Ranhill Engineers And Constructors Sdn Bhd | Proposed Pipe Rehabilitation Works Year 2008 For Kluang District Sub. Con. C1500/9001 – 300mm ND M.S Steel Pipeline At CKL1:300mm ND M.S Pipeline At Sen See, Spg Renggam. CKL2:300mm ND M.S Pipeline At Jalan Kota Tinggi. CKL3:150mm ND UPVC Pipeline At Jalan Besar Kluang | 15/09/08 – 14/04/09 | 2,318,037.00 |
Ranhill Engineers And Constructors Sdn Bhd | Ranhill Engineers And Constructors Sdn Bhd | Design, Construction, Supply, Delivery, Installation, Integration, Testing And Comissioning Of The Programme Of Works. Sub-Contact Works For Package 8 (C1483)/9001-Construction And Completion Of 9.0ml New RC Ground Reservior At Bukit Mengkibol And Laying Of 900mm Dia. 1.0km Mild steel falling Main, Kluang | 15/03/08 – 14/05/09 | 7,150,000.00 |
TPM Technopark Sdn. Bhd | JK Bersatu Sdn Bhd | Cadangan Membina Tangki Air 8.0 Juta Gelen Di Kawasan Perindustrian Tanjung Langsat, Johor | 24/11/08 – 23/11/09 | 12,310,000.00 |
UEM Builders Group Co. | UEM Construction Sdn. Bhd | Job No. : LK2/PMD/UUD/S5/05-001. Proposed Construction, Completion And Maintenance Of Package 3B, Pontian Link At The Linkedua Expressway – Utilities And Services – Water Pipes And Fittings | 05/02/07 – 06/04/07 | 503,089.00 |
SAJ Holdings Sdn. Bhd. | SAJ Holdings Sdn. Bhd. | No. Kontrak : SAJH/KP/T/37/2007. Kerja-Kerja Pengalihan Paip 500mm Dia. Mild Steel Di Taman Nusa Damai, Pasir Gudang, Johor Bahru, Johor. | 10/04/07 – 09/05/07 | 390,000.00 |
SAJ Holdings Sdn. Bhd. | SAJ Holdings Sdn. Bhd. | Proposed Remadial And Improvement Works Of Slope Failure At Taman Bukit Tiram Reservior, Ulu Tiram, Johor Bahru, Johor. | 15/06/07 – 14/10/07 | 1,325,000.00 |
Jabatan Bekalan Air Kedah | Taliworks Corp. Bhd | Projek Bekalan Air Padang Terap Pakej 1, 2 & 3 Secara Reka Dan Bina Sub-Contract No. 8-Structural Works For Chlorine Contact & Treated Water Tanks, Wash Water Tank And Sludge Lagoon. | 12/03/07 – 07/04/08 | 2,274,634.58 |
Ranhill Engineers And Constructors Sdn. Bhd. | Ranhill Engineers And Constructors Sdn. Bhd. | Proposed Pipe Rehabilitation Works Year 2007 For Kota Tinggi Discrict. Sub- Contract Works For Proposed Pipe Rehabilitation Works Year 2007 For Kota Tinggi District. | 10/09/07 – 09/05/08 | 2,347,006.20 |
SAJ Holdings Sdn. Bhd. | SAJ Holdings Sdn. Bhd. | Kerja-Kerja Bagi Membaikpulih Cerun Runtuh Pada Paip Outlet 1400mm Dia. MS Di Tangki Bukit 75, Seelong, Johor. | 08/01/07 – 07/04/07 | 546,053.36 |
JKR Ibu Pejabat Kuala Lumpur | Batu Layang Corporation Sdn Bhd | Cadangan Membina Jalan Dari Ulu Pauh Melalui Chuping Ke Padang Besar, Perlis. – Pakej 3 : Menaiktaraf Laluan Persekutuan 7 | 01/02/06 – 02/12/09 | 44,500,000.00 |
Ranhill Engineers And Constructors Sdn Bhd | Ranhill Engineers And Constructors Sdn Bhd | Design, Construction, Supply, Delivery, Installation, Integration, Testing And Comissioning Of The Programme Of Works. Sub-Contact Works For Construction And Completion Of 1059ml Elevated R.C Reservior And Ancillary Works At Parit Jawa, Muar, Johor. | 01/07/06 – 30/06/10 | 3,749,000.00 |
Universiti Malaya | DPI Konsult Sdn. Bhd. | Kerja-Kerja Tanah, Sub Struktur Dan Kerja-Kerja Berkaitan Bagi Cadangan Membina Kompleks Makmal Kimia (1 Blok Makmal Kimia, 1 Blok Bangunan Pentadbiran Dan Akademik Serta 1 Blok Bangunan Tempat Letak Kerata) Di Universiti Malaya | 07/04/06 – 16/11/06 | 14,256,850.96 |
Ranhill Bersekutu Sdn. Bhd. | Ranhill Engineers And Constructors Sdn. Bhd. | Bekok Raw Water Transfer Scheme – Sub Contract Works For Laying Of Raw Water Pipes From Yong Peng WTP To Sembrong Lagoon Intake – Pakage 6 | 01/03/06 – 31/01/07 | 12,857,787.21 |
Ranhill Bersekutu Sdn. Bhd. | Ranhill Engineers And Constructors Sdn. Bhd. | Contract No. : C1464/9001. Proposed Pipe Rehabilitation Works Year 2006 For Kota Tinggi Discrict | 20/11/06 – 19/08/07 | 3,490,000.00 |
Ranhill Bersekutu Sdn. Bhd. | Ranhill Engineers And Constructors Sdn. Bhd. | Contract No. : C 1438. Construct And Commission 4.54ml RC Balancing Reservior, Access Road And All Ancillary Works For Mersing Water Supply Scheme | 04/04/05 – 28/02/06 | 6,760,171.00 |
Ranhill Bersekutu Sdn. Bhd. | Ranhill Engineers And Constructors Sdn. Bhd. | Contract No. : C 1433 / 9001. Supply, Lay And Commission 13.5km x 500mm Dia. MS Pipeline From Sg. Sayong To Renggam, Kluang And Ancillary Works | 08/08/05 – 15/04/06 | 1,300,000.00 |
Ranhill Bersekutu Sdn. Bhd. | Ranhill Engineers And Constructors Sdn. Bhd. | Contract No.: C1452 / 9001. Proposed Pipe Rehabilitation Works Year 2005 For Johor Bahru Discrict | 15/11/05 – 14/03/06 | 2,238,654.30 |
Ranhill Bersekutu Sdn. Bhd. | Ranhill Engineers And Constructors Sdn. Bhd. | Contract No.: C1499 / 9001. Proposed Pipe Rehabilitation Works Year 2005 For Batu Pahat Discrict | 15/11/05 – 14/03/06 | 3,537,117.10 |
Pilecon Civil Works Sdn. Bhd. | Active Review Sdn. Bhd. | Johor Bahru Water Supply Privatisition Project Stage 3 Works Sub Contract No. 43 Sec. B Laying Of 1300mm FID Mild Steel Pipes & Construction Of Ancillary Works. | 01/03/02 – 28/02/03 | 11,922,302.00 |
SAJ Holdings Sdn. Bhd. | Sepakat Setia Perunding (Sdn) Bhd | Contract No. : 28C. Supply, Lay & Commission 1100mm Dia. Steel Pipes, Specials & Ancillary Works From Pasir Gudang – Tebrau Reservior In Johor Bahru District. | 01/09/02 – 31/08/03 | 5,581,780.00 |
SAJ Holdings Sdn. Bhd. | Sepakat Setia Perunding (Sdn) Bhd | Contract No. : C1328 Supply, Lay & Commisioning Of 500mm Dia MS Pipeline From Bukit Dinding Reservoir To Bukit Naning, Muar | June – Nov ’03 | 1,500,000.00 |
Kementerian Pembangunan Luar Bandar | Haikal Jurutera Perunding Sdn. Bhd. | Projek Membina Dan Menyiapkan Projek Bekalan Air Luar Bandar Secara Konsep Bersepadu Negeri Johor Bagi Tahun 2003/2004 | March ’04 – Dis ’04 | 8,000,000.00 |
SAJ Holdings Sdn. Bhd. | Ranhill Engineers And Contructors Sdn. Bhd. | Contract No. : SAJH/KP/T/16/2004 Proposed New ‘S’ Bend For 600mm Dia. MS Pipe Crossing Sg. Simpang Kiri ( From Kg. Parit Ismail To Kg. Parit Awang ) In Batu Pahat, Johor | 28/04/04 – 04/11/04 | 1,788,591.00 |
SAJ Holdings Sdn. Bhd. | Ranhill Civil Sdn. Bhd. | Contract No. : C1329 Distribution Improvement Works In Pontian Contract 5, Construction Of 6.82ML Pekan Nenas R.C Reservoir And Associated Works | Sept ’03 – Aug ’04 | 3,480,000.00 |
SAJ Holdings Sdn. Bhd. | Ranhill Civil Sdn. Bhd. | Contract No. : C1320 Distribution Improvement Works In Pontian Con.3 2.27ML Bt. 34 Elevated R.C Reservoirs & Associated | Sept ’03 – Dis ’04 | 3,690,000.00 |
SAJ Holdings Sdn. Bhd. | Ranhill Civil Sdn. Bhd. | Contract No. : C1266 Zone B : Package B2b Sub Contract Works for Supply, Lay And Commission 701.2 FID x 2.8 KM M.S Pipes, Special And Ancillary Works For Falling Main To Bukit Serene Tank | Dis ’03 – Apr ’04 | 1,330,000.00 |
SAJ Holdings Sdn. Bhd. | Ranhill Engineers And Contructors Sdn. Bhd. | Contract No. : C1265 Supply, Lay And Commission Of 900 mm Dia. Mild Steel Pipes, Specials And Ancillary Works At Jalan Senyum, Jalan Tebrau, Jalan Storey And Jalan Indera Putera In Johor Bahru City | Dis ’03 – Apr ’04 | 1,214,000.00 |
JBA Negeri Sembilan | SMHB Sdn. Bhd. | Pemindahan Air dari Sg. Muar Ke Empangan Talang, Kuala Pilah, Negeri Sembilan Darul Khusus – Sub-Contract For The Laying Of DN 1150mm MSCL Raw Water Pipe Inclusive Of Ancillary A23 Works | Apr ’04 – oct ’04 | 5,998,040.00 |
Damansara Realty Bhd. | Jurutera Perunding Madani Sdn. Bhd. | Relocation Of 1300mm Dia. MS Pipe @ Phase 1B and Townhouse, Damansara Aliff, Tampoi, Johor Bahru | Sept ’04 – Nov ’04 | 445,000.00 |
Runhill Bersekutu Sdn. Bhd. | Runhil Engineers And Contructors sdn. Bhd. | Contract. No. : C 1277 Proposed Distribution Improvement Works To Replace Water Supply From PUB Offtakes In Johor Zone C Package C2-1100mm FID and 801.2mm FID MS Pipe From Jalan Danga To Jelutong Suction Tank | Nov ’04 – Feb ’05 | 1,070,050.00 |
Dewan Bandaraya Kuala Lumpur | Dewan Bandaraya Kuala Lumpur | Cadangan Memperbaiki Perparitan Utk Kawasan Tadahan Sungai Anak Air Batu / Sungai Pantai Fasa III, Kuala Lumpur. | 29/09/95 – 28/07/96 | 2,456,396.00 |
SAJ Holdings Sdn. Bhd. | Syed Muhammad, Hooi & Binnis Sdn. Bhd. | Projek Bekalan Air Mersing Menaikkan Taraf Loji Rawatan Air Tenglu, Contract No.4 – Supply & Lay Treated Water Pipeline & Construction For 1.0mg of R.C Reservoir. | 01/01/96 – 29/12/96 | 4,693,348.00 |
JKR Selangor | JKR Selangor | Membina & Menyiapkan Sekolah Keb. T.U.D.M Subang, Petaling Selangor. | 08/02/95 – 09/01/96 | 2,263,000.00 |
JKR Selangor | JKR Selangor | Membina & Menyiapkan Sekolah Keb. Sek. 6 Shah Alam, Daerah Petaling, Selangor. | 04/03/96 – 02/02/97 | 2,756,000.00 |
P.K.N.S Shah Alam | PRY Sdn. Bhd. | Cadangan Paip Air Induk Utk 1300mm-600mm Dari Tangki Air Baru,Bukit Jelutong untuk Pembangunan Seksyen 7, shah Alam. | 01/04/96 – 02/02/97 | 11,290,240.00 |
JSEDC Technopark Sdn. Bhd | Gabungan Jurubina Sdn. Bhd. | Cadangan Membina & Menyiapkan Tangki Air 190,000 Gelen & Tangki Sedut 60,000 Gelen Serta Sistem Retikulasi Air & Kerja-Kerja Berkaitan Utk Kampung Kopok Baru, Di Batu 18, Jalan Masai-KongKong, Masai Johor. | 29/06/96 – 28/06/97 | 2,129,000.00 |
SAJ Holdings Sdn. Bhd. | Sepakat Setia Perunding (Sdn) Bhd | Contract No.15 – Supply, Construction & Completion Of 300mm / 700mm Dia Steel Pipes & Specials, 2.35ml PC Reservoir & Ancillary Works At Gelang Patah & Kg. Pok Kechil. | 10/03/97 – 09/01/98 | 3,929,017.00 |
SAJ Holdings Sdn. Bhd. | Sepakat Setia Perunding (Sdn) Bhd | Projek Mempertingkatkan Sistem Agihan Air Daerah Johor Bahru Con.27, Supply, Lay & Commission 700mm Dia. Steel Pipes & Special & Ancillary Works fm Kg. Paya Mengkuang Junction – Tg Pelepas Port. (No. Kontrak: SAJ/T/129/98) | 16/11/98 – 15/07/99 | 2,699,752.00 |
Scientex (M) Sdn. Bhd. | Serumpun Consultant Sdn. Bhd. | Proposed Construction & Completion Of 1ml Gallons Water Reservoir Tank & Associated Piping Earthworks & External Works. | 15/03/99 – 15/01/00 | 1,013,301.65 |
Perbadanan Kemajuan Negeri Selangor | PRY Sdn. Bhd. | Cadangan Membina & Menyiapkan Menara Tangki Air 2 x 750,000 Gelen Di Seksyen 21, Shah Alam. | 01/10/98 – 15/01/00 | 11,396,146.00 |
Syarikat Pembangunan Hartanah Guthrie Sdn. Bhd | Perunding AV Sdn. Bhd. | Proposed Supply, Installing & Commissioning of 600mm Dia. Water main fm Lambee Reservoir For Cadangan Pembangunan Sungai Kapar Indah diatas lot-lot 3 & 60 (sebahagian ladang Sg. Kapar) Bt. 6 Jln Kapar Mukim Kapar Daerah Klang Selangor. | 12/01/00 – 30/01/01 | 7,769,709.00 |
JKR Perak | CMS Construction (M) Sdn. Bhd. | Membina dan Menyiapkan Jalan Malim Nawar-Kuala Dipang dan Kerja-kerja Berkaitan di Daerah Kinta, Perak Darul Redzuan. | 08/05/01 – 02/07/02 | 4,996,980.00 |
Perbadanan Kemajuan Negeri Selangor | PRY Sdn. Bhd. | Cadangan Membina & Menyiapkan Tangki Air 2.5 Juta Gelen Tangki Sedut 1.0 Juta Gelen & Rumah Pam di Seksyen 16, Shah Alam. | 08/02/01 – 02/10/02 | 20,900,000.00 |
Kementerian Pendidikan Malaysia | Wan Muhammad & Khoo | External Sewerage Mains & Manhole Construction | 16/06/89 – 30/04/90 | 303,029.00 |
Kementerian Pendidikan Malaysia | Jabatan Kerja Raya | Membina & Menyiapkan 1 Blok 3 Tingkat Di Sekolah Menengah Tuanku Abdul Rahman & 1 Blok Bilik Darjah Di Sekolah Menengah Sultan Allauddin Kulai,Johor Bahru | 09/04/90 – 11/04/91 | 1,298,994.00 |
PKNS Perlabuhan Klang | Berakan Jurutera Perunding Sdn. Bhd. | Membina Sistem Saluran Air Utama Untuk Bandar Sultan Sulaimen, Pelabuhan Klang, Selangor. | 06/11/91-03/11/92 | 6,034,353.00 |
PKNS Shah Alam | PRY Sdn. Bhd. | Pemasangan Paip Induk Daripada Kawasan Hicom Ke Seksyen 23, Shah Alam. | 01/12/91-18/01/92 | 4,233,486.00 |
Negara Properties Sdn. Bha. | BW Perunding Sdn. Bhd. | Joint Water Supply Scheme For Taman Melati Hawthronden Estate, Wilayah Land Taman Cemerlang Desa Mulia Gombak Land & Immetec. | 02/05/92-17/10/92 | 1,071,366.26 |
JBA Perak | Inovest-Lyonnaise Sdn. Bhd. | Kerian, Larut & Matang Water Supply Stage II Contract No.3 – Laying Of Pipelines & Valves. | 22/07/90-21/04/92 | 3,903,498.00 |
JKR | JKR | Membina dan Menyiapkan Sekolah Kebangsaan Pandan Jaya, Ampang Dalam Daerah Hulu Langat. | 10/06/93-6/07/94 | 3,279,760.00 |
JBA Negeri Sembilan | Jurutera Kerja JBA Negeri sembilan | Supply & Lay Of 500mm & 300mm dia. Mild Steel Pipe For Projek Bekalan Air Baru Gemas Negeri Sembilan. | 26/10/93 | 2,263,000.00 |
PKNS Shah Alam | PRY Sdn. Bhd. | Pengalihan Paip Sedia Ada dr Persiaran Gudang Ke Persiaran Selangor Berhampiran Kilang CCM Di Seksyen 16, Shah Alam. | 12/10/92-01/03/93 | 2,480,482.00 |
Equiventures Sdn. Bhd. | Ranhill Bersekutu Sdn. Bhd. | Johor Bharu Water Supply Privatisation Projects Works Contract No.32- Laying Of 1000mm & 1200mm dia. M.S Pipe & Construction Of Sungai Buloh Pipeline. | 15/09/94-14/11/94 | 3,321,700.00 |
Equiventures Sdn. Bhd. | Ranhill Bersekutu Sdn. Bhd. | Laying of 1300mm & 1400mm dia. M.S Pipes & Asso Works From Sungai Johor RWPS To Sungai Johor TWPS – Kota Tinggi / Kulai Road. (Sub-Contract For Active Review Sdn. Bhd.) | 03/05/94-02/09/94 | 1,099,999.00 |
SAJ Holdings Sdn. Bhd. | Sepakat Setia Perunding (Sdn) Bhd | Contract N0.8 – Supply, Lay, Test & Commission 1100mm Dia Mild Steel Pipe & Special Along Kampung Maju Jaya Road & From Bukit Skudai Reservoir. | 30/03/94-27/05/95 | 5,996,283.00 |
Kementerian Pertahanan Malaysia | JKR Wilayah Persekutuan | Penyelenggaraan Bangunan/Kem Angkatan Tentera Di Wilayah Persekutuan Kuala Lumpur i) Membaikpulih Kemudahan Jalan Di Pasukan- Pasukan Kem Batu Kentomen, Kuala Lumpur. ii) Membaikpulih Bangunan & Kemudahan Di 92 DKP Batu Kentomen, Kuala Lumpur. | 01/10/94-30/12/94 | 700,000.00 |
Kumpulan Perubatan Johor Sdn. Bhd. | Zainuddin Nair & Ven Associates | The Execution & Completion Of The Ampang Puteri Specialist Hospital On Lot 32884, Jalan Memanda 9, Mukim Ampang, Hulu Langat Selangor (Plumbing Services) | 06/12/93-02/95 | 1,200,000.00 |
Kementerian Pelajaran Malaysia | Jurutera Daerah Gombak | Membina & Menyiapkan 3 Blok Bangunan 3 Tingkat Workshop, Kantin & Kerja Lain Bersangkutan Utk Sek. Men. Rendah Bt. Caves Daerah Gombak. | 1/04/85-1/07/85 | 1,936,744.00 |
UUM Kedah | Kumpulan Senireka Sdn. Bhd. | Tender For Screeding Pavior & Filling Works To Faculty Block Including Linkway & Bangunan UUM Kedah. | 04/85-07/85 | 322,823.00 |
PKNS | Wan Muhammad & Khoo | Bekalan Air Di Sek. 18 & Memasang Paip 750 mm dia & Jacking Menerusi Lebuhraya Dari Tangki Air Sek.13 Ke Bulatan Toshiba Shah Alam. | 3/06/85-30/12/85 | 2,281,370.00 |
Pandan Maju Sdn. Bhd. | Zaidun-Leeng Sdn. Bhd. | Proposed Construction Of Main Drain/ Contract No. 1622/MD/1678877, Kg. Pandan Tengah, Mukim Ampang Wilayah Persekutuan For M/S Pandan Maju Sdn. Bhd. | 05/01/87-31/09/88 | 2,218,528.38 |
Kementerian Pelajaran Malaysia | JKR Batu Pahat Johor | Membina & Menyiapkan Blok-Blok Bangunan Sekolah & Lain-Lain Kerja Berkaitan Di Daerah Batu Pahat, Johor. (Package WB 8/J4) | 11/04/87-6/11/87 | 3,049,000.00 |
Project Genting Klang | Engineering & Environ Metal Consultants | Wangsa Maju Development Project Earth Work For Sector R6. | 25/09/90-25/02/91 | 1,049,727.35 |
JBA | Jurutera Daerah JBA Muar | Membekal & Memasang Paip Air 300mm Mild Steel Termasuk Kelengkapannya Di Jalan Sungai Abong Muar, Johor. | 01/11/90-21/08/91 | 1,166,217.50 |
P.K.N.S Shah Alam | PRY Sdn. Bhd. | Pembinaan Tambahan Sistem Induk & Pelbagai Kerja Mengubahsuai Sistem Untuk Seksyen 8 Shah Alam. | 01/12/90-16/11/91 | 2,660,034.00 |
Kementerian Pendidikan Wilayah Persekutuan | JKR Wilayah Persekutuan | Membina & Menyiapkan Bangunan Tambahan Di Sek. Ordinan Di Kem Batu Kentoment Jalan Ipoh Kuala Lumpur | 16/01/91-12/10/91 | 1,176,968.50 |
P.K.E.N.J Johor | Sepakat Setia Perunding (Sdn) Bhd | Proposed 628mm FID Reticulation Main From 18.18ml Sg. Buloh Reservoir to Proposed Zone 14 Industrial Estate at Pasir Gudang, Johor Bahru. | 08/07/91-22/12/91 | 1,267,069.00 |
Kementerian Pertahanan Bahagian Polis Hutan | KAB Construction & Engineering Sdn. Bhd. | Supply Lay Floor & Wall Tiles To 31 Block Class G Quarters To The Police Force Camp. Phase II Kulim Kedah (Sub-Contractors) | 15/12/87-09/98 | 788,000.00 |
Kementerian Kerja Raya Malaysia | JKR Kota Tinggi | Laying of 508mm O.D & 323.9mm O.D Pipe Along Jalan Lombong & 406.4mm Steel Pipe Along Jalan Mersing & Jalan Pengerang Kota Tinggi. | 15/12/87-11/10/98 | 378,140.00 |
P.K.E.N.J Johor | Perunding Budiman Sdn. Bhd. | Construction & Completion Of 400mm dia Steel Water Mains For Kawasan Perindustrian Senai II, Johor. | 25/01/90-03/10/90 | 827,106.10 |
Kementerian Pendidikan Malaysia | Wan Muhammad & Khoo | To Supply, Delivery, Installation, Testing, Commisioning & 2 Years Comprehensive maintenance Of Plumbing & Sanitary Service Package 1 & 2 For ITM Branch Campus Jengka Pahang | 16/06/89-31/05/90 | 565,480.00 |
Kementerian Pertahanan Malaysia | Jurutera Consultants (SEA) Sdn. Bhd. | Tender Package No.35 Supply & Lay 450mm dia. Watermain From Federal Highway To TUDM Base, Subang | 17/12/84-16/06/85 | 1,685,176.60 |
Vatron Holding Sdn. Bhd. | Rahmat Chuan & Lim Sdn. Bhd. | Water Supply Reticulation Pipe To Cadangan Rancangan Perumahan Diatas Lot 720 MK, Pacang Badera, Pekan Sg. Besar Daerah Sabak Bernam,Selangor | 10/05/85-30/06/85 | 160,000.00 |
JKR Negeri Sembilan | Perunding Bakti Sdn. Bhd. | Tender For Cold Water Supply & Sanitary Plumbing For Cadangan Kompleks Sekretariat & Undangan Neg. Sembilan | 12/85-04/86 | 436,600.00 |
Bidara Holding Sdn. Bhd. | Angkasa Jurutera Perunding | Construction Of Water Reticulation Syst Consist Of 6″,8″,12″, AC Pipe Including Construction Of 60,000 RC Suction Tank And 250,000 Gel Elevated Water Tank Completed Water Booster Pump House For Taman Bidara, Selayang, Selangor | 10/05/85-03/86 | 1,750,350.00 |
Koperasi Polis Di Raja Malaysia | Jurutera Bersatu | The Execution & Completion Of Water Reticulation Ancillary Works For The Housing Dev. Parcel 2 On Part Of Lot 4729 Mukim Bt. Kuala Lumpur Contract 1&11 | 12/85-04/86 | 491,365.45 |
United Estate Project Bhd. | Tahir Wong Sdn. Bhd. | Supply & Lay Of water Main & Ancillary Works To Phase 4C1 & 4C2 At Subang Jaya New Town Ship (N.S.C To S.E.A Drillers Sdn. Bhd.) | 04/86-/08/86 | 186,889.00 |
Kementerian Pelajaran | Jabatan Kerja Raya Unit LKTP, Bahau | Membina & Menyiapkan 2 Blok Bangunan 3 Tingkat Workshop & Kantin Utk Sek. Men. Rendah Jelai (Felda) Tampin Negeri Sembilan (Package WB 8/NS) | 27/06/86-08/01/87 | 1,100,755.00 |
Hwa-Li Dev Sdn. Bhd. | Halaludin Ho & Yu | Construction & Completion Of Pump House Imhoff Tank & Sewerage Reticulation To Taman Rajawali For Hwa-Li Development Sdn. Bhd. | 02/86-02/87 | 1,000,000.00 |
UUM Kedah | Kumpulan Senireka Sdn. Bhd. | Pavion & Tillings Works To Cadangan Fasa 2B UUM Di Bandar Baru Darul Aman Kedah | 03/86-05/87 | 276,805.30 |
JKR Kedah | JKR Kedah | Kerja-Kerja Paip Jacking Bg. Pemasangan Paip Yang Menyeberang Landasan Keretapi Di Pinang Tunggal Sungai Petani Kedah. | 26/03/88-26/04/89 | 49,500.00 |
Jabatan Bekalan Air Selangor | Syed Muhammad, Hooi & Binnis Sdn. Bhd. | Semenyih Distribution Works Cont. No. 1 Supply & Lay 600mm to 750mm Dia. Steel Pipeline Including 1800mm dia Pipe Jacking Work Through Persiaran Selangor Shah Alam. | 29/08/88-25/11/89 | 2,997,413.00 |
Dewan Bamdaraya Kuala Lumpur | Dewan Bandaraya Kuala Lumpur | Bekalan Air, Pemasangan Alat Sanitary & Kerja Kerja Berkaitan Kpd Bangunan Yang Sedia Ada Dala Sewerage City Area. | 02/89-02/90 | 6,000,000.00 |
UUM Kedah | Jabatan Kerja Air Kedah | Alor Setar Water Supply Phase IV (North Kedah) Package 1 : Contract 3- Tha Laying Of 1270mm & 804mm O.D. Steel Pipeline | 06/06/89-09/90 | 1,667,387.00 |
Multipurpose Co. | Arkitek Berjasa Sdn. Bhd. | 100 Units Single Storey Housing Scheme At Mantin Negeri Sembilan | 15/09/79-07/03/81 | 2,363,500.00 |
Sugul Emas Sdn. Bhd. | Pereka Bersatu Cheras Kuala Lumpur | 150 Unit Perumahan At Gali, Raub Pahang | 28/04/80-28/12/81 | 4,804,900.00 |
Bangunan Perumahan Syarikat Kerjasama Bhd. | Arkitek Senireka Sdn. Bhd. | Domestic Plumbing Works To 212 Units Terrace Houses, Mukim Klang, Selangor | 13/06/80-15/12/81 | 346,500.00 |
Malaysia Mining Corperation | Hijjas Kasturi & Associates Menara Promet | Renovation & Existing Office Block at Jalan Tangsi, MMC Building, Kuala Lumpur | 12/05/81-12/04/82 | 175,000.00 |
Koperasi Serba Guna Anak Melayu | Zainuddin Mohd Radzi Sdn. Bhd. | Cold Water Supply & Sanitary Plumbing For Proposed 7 Storey Bank Building at Lot 7, Jalan Melayu Section 72, Kuala Lumpur. | 07/09/82-15/10/83 | 175,000.00 |
YAB Dato Musa Hitam JPM | Jurubina Bertiga Int. Sdn. Bhd. | Proposed Addition & To Existing 2 Storey Including Guard House On Lot 299 Lorong Gurney Off Jln Gurney, Kuala Lumpur For YAB Dato Musa Hitam | 08/82-10/83 | 1,146,523.00 |
Angkasa Jurutera Perunding | Zainuddin Radzi & Rakan Sdn. Bhd. | Proposed RC Retaining Wall To 2 Storey Detached House on Lot 12 Jalan 12/3 Shah Alam | 11/82-01/83 | 102,000.00 |
Datin Habibah Baharuddin | Jurubina Bertiga Int. Sdn. Bhd. | Renovation & Extension To An Existing 3 Storey Building At Jalan Raja Alang Kampung Bharu, Kuala Lumpur | 11/82-06/83 | 90,600.00 |
PKNS petaling Jaya | Sigoh Din Sdn. Bhd. | Kerja-Kerja Paip Bg. Bekalan Air Mengandungi Paip Berukuran 6″,8″,10″,12″,15″,18″,21″ G. Pusat & AC MS Paip & Kerja Kerja Bersangkutan Bg. PKNS. | 11/08/82-9/11/83 | 1,146,523.00 |
Perbadanan Kraftangan Malaysia | Arkitek Bersekutu Sdn. Bhd. | Upgrading & Existing To wisma Batek Building At Jalan Tun Perak, Kuala Lumpur. | 08/82-10/83 | 529,394.53 |
New Acres Sdn. Bhd. | Seni Wisma Sdn. Bhd. | Domestic Plumbing Works Contract For 3 Storey Compact House At Taman Seri Muda | 12/82-11/83 | 323,320.00 |
Shimizu Premba Sdn. Bhd. | Water Reticulation System To Wangsa Maju House Project at Jalan Genting Klang Setapak, Kuala Lumpur | 11/83-01/84 | 120,680.00 |